REMINDER
MANDATORY installation in zone 1 for the following devices : FLAME, MURAT, BALMET, COME, CHAUVET, AUBRAC, PAVIN
Authorized installation in zone 1, zone 2, zone 3 for the following devices : MAURIAC 10, MAURIAC 12C
More information about the zones.
- Commissioning will take place within an average of 15 working days following the request for commissioning.
- The appliance must be connected to the flue, to the electrical network and loaded with pellets.
- The user and / or the installer must be present during commissioning (approximately 1 hour).